YPAC Case Study: Liquid Pipeline Case Study
Event Description: The YPAC Case Study was initiated in October 2015. The presentations will follow a Progressive Case Study that will walk young pipeliners through the work that is required to conceptualize, design and operate a Liquid Pipeline in Alberta. Our next Guest speaker will be providing an overview of Pipeline Routing throughout the Design Phase.
Date: February 25th, 2016
Time: 11:30-1:00pm
Location: Calgary Petroleum Club
Link: http://ypac-routing.eventbrite.ca

image003